What is a CCP? A Critical Control Point is a point or step in a treatment process where control can be applied and a hazard prevented, eliminated, or reduced to an acceptable level. At each CCP you monitor a parameter against limits and act when those limits are approached.

Tell us about your plant and it builds a CCP register for you — each control point with its objective, monitoring, a three-tier limit set (target range, action limit, critical limit), corrective actions and support systems.

  • Critical limits come from the DWQAR 2026 where the rules set them.
  • Target and action limits are suggested with margin inside the critical limit — adjust to your plant.
  • The CCP Register tab fills in automatically; export or save on Report & Save.

New to it? Turn on Show worked example to see a filled register, then switch it off to build your own.

See a filled-in example supply, then switch off to enter your own. Show worked example

Supply details

Just enough to label your register.
The numeric critical limits shown are the Level 3 monitoring-rule values.

Source water class

Sets the protozoa treatment target, which sets your filter turbidity limit (DWQAR rule 8 & T3.PC.2).

Treatment steps

Select every step your plant runs. Each control point becomes a CCP.

Your CCP register. Each card follows the standard structure:

  • Objective — what the control point achieves.
  • Monitoring — parameter, analyser, location, who is responsible, and records.
  • Performance criteriatarget range, action limit and critical limit. Critical limits set by a rule are locked; the rest are editable.
  • Held-for duration — how long a limit must be exceeded before it applies, entered under each action and critical limit. Type a time (for example 2 min) or a proportion of run time (for example 5% of daily run time); the field suggests common values as you type.
  • Corrective actions — separate responses at the action and critical tiers.
  • Support systems — instrument and operational upkeep.

Everything you edit is saved and included in the report.

Export your register or save your work.

  • PDF report — a formatted, print-ready register.
  • CSV — the register as a spreadsheet.
  • Save (JSON) — downloads everything you've entered; load it back to continue.

Include in export

Select the sections to appear in the PDF and CSV.

Export

PDF and CSV of your CCP register.

Save & load

Save keeps everything in one JSON file on your device. Load restores it.

About this model

What a CCP is

A Critical Control Point (CCP) is a point or step in a process where control can be applied and a hazard prevented, eliminated, or reduced to an acceptable level. Each CCP has an objective, monitored parameters, performance criteria (target, action and critical limits), corrective actions and supporting systems.

Model basis

The CCP structure follows the WHO Water Safety Plan framework. In New Zealand the framework sits within a supply's Drinking Water Safety Plan. The DWQAR does not define "critical control point"; its defined term is barrier. This tool maps the DWQAR treatment rules onto the CCP structure, which is where the numeric critical limits and monitoring requirements live.

Performance criteria (three tiers)

The critical limit is the anchor. Suggested target and action limits sit inside it by the margins set in Settings. Parameters can be one-sided (minimum or maximum) or a band with both a low and a high limit (for example pH or an operating FAC band).

Critical limit sources

UV control approach

Two approaches are supported because they change what the CCP limit is set on:

UVT is monitored continuously in both cases; low UVT under dose-pacing drives higher output rather than an immediate under-dose, and alarms when the reactor can no longer maintain the validated dose.

Assumptions & limitations

References (public domain)

Version 2.2

Settings

Coefficients for the suggested target and action limits. Changing these updates suggestions for limits you haven't manually overridden.

How far the action limit sits inside the critical limit.
How far the normal operating target sits inside the critical limit.
Adds the plant-outlet compliance point (turbidity 5/10 NTU, FACE 0.2 mg/L).